The Dutch power system: a walkthrough
A living argument for the European partner: we show we understand your market's pain points — not in words but in the structure of the atlas.
Act I · Context: a grid under pressure
The Netherlands runs one of the most loaded grids in Europe. Three forces squeeze it at once: explosive rooftop solar growth (the south leads), electrification of heat and transport (heat pumps, EVs), and urban density on old cables laid in an era when “flow” meant one direction.
The result is the classic duck curve: at midday the sun displaces central generation and pushes reverse flow into distribution networks; in the evening there is still a peak of heat pumps and charging. A grid designed for one-way delivery lives in a two-way world.
Act II · The problem: congestion at distribution level
The key pain point is congestion management at DSO level (Enexis, Liander, Stedin): LV/MV congestion, long queues for new large connections, “negative” fees for connecting solar farms in saturated zones, and very expensive and slow reinforcement.
In our atlas this is a dedicated branch “Markets and regulation → Congestion management”: non-wires alternatives (NWA), topological reconfiguration (MISOCP), voltage optimization (VVO, Q(V) curves), sensitivity-based constraints. These are the tools an engineer thinks about congestion with — and the ones we speak to it in.
Act III · Markets: where the money and flexibility are
The Netherlands is a laboratory of flexibility markets: balancing products (FCR, aFRR, mFRR), the GOPACS platform (a TenneT and DSO initiative for local flexibility), DSO local markets where aggregators offer load reductions in congested zones.
The economics are simple: small devices — batteries, EVs, heat pumps — don't reach the market individually; aggregated, they become an asset. Our atlas holds this logic in branches: “Optimization and control” (MPC, stochastic optimization, resource portfolio) and “Batteries: BMS” (SOC/SOH, degradation) — the mathematical backbone of an aggregator business.
Act IV · What Energomodernization brings
We close the gap between “the grid problem” and “the software product”: from congestion calculation (power flow, sensitivities, LinDistFlow — the “Grid physics” branch) to market logic (bidding, reserve portfolio — the “Markets” and “Optimization” branches).
The engagement format is a pilot: a chosen task (say, assessing the suitability of a flexibility portfolio for a DSO market), acceptance criteria up front, a calculation and a formula-rich report. The pilot is cheap because production runs on our academies-and-network economics.
Open the atlas and verify
Three entrances into the atlas — with what to look at:
- Branch “Grid physics and modes” — Mode calculations, state estimation — the foundation of any congestion analysis
- Branch “Markets and regulation” — Congestion management, markets, GOPACS logic — the DSO pain language
- Branch “Optimization and control” — MPC, stochastics, flexibility portfolio — how it converts into money
The Dutch version of this page is primary (see /nl/atlas-nl.html); this is the English mirror.